Bogie turn table
Once the bogie has been removed and pulled out from under the train, it usually goes to the bogie workshop for further processing. The easiest way to do this is on rails.
The necessary changes in direction or track changes are made by means of suitably sized turntables that are installed in the floor. These are turned by hand or electrically.